Investment Activities

GRI 203-1

Investment activities are one of the key areas of the general development strategy of the Company and is intended to ensure the growth of operating profit.

Investment activities are aimed towards augmenting the reliability and enhancing the operation of the power grid complex, as well as reducing losses in power grids.

Progress on the investment programme

Indicators

UoM

Period

2022, actual

2023, actual

2024, actual

Δ 2024/2023, %

Amount of funding

RUB million incl. VAT

4,813

5,417

6,569

121

Capital investment utilisation

RUB million excl. VAT

4,050

3,445

5,214

151

Commissioning as fixed assets

RUB million excl. VAT

3,417

3,523

4,878

138

Commissioning as a part of fixed assets of transformer capacities

MVA

325

115

269

234

Commissioning as part of fixed assets of power transmission lines

km

594

681

1,391

204

The volume of investments in 2024 is mainly directed to two types of activities, namely, to finance investment projects for grid connection – RUB 4,092 million including VAT, or 62% of the total volume of investments, and to finance investment projects for renovation, upgrade, retrofitting – RUB 1,395 million, including VAT, or 21% of the total volume of funding.

The majority of investments made within the area of grid connection operations went towards executing the agreements for the grid connection of a subsidised group of customers with connected capacities of up to 150 kW. The amount of funding for these activities in 2024 totalled RUB 2,991.2 million, or 73% of the total funding for grid connection.

The main volume of investment activities related to renovation, upgrade and retrofitting included financing of measures for development and upgrade of electricity (capacity) metering, namely RUB 645 million, or 46% of the total retrofitting and renovation financing.

Structure of capital investment financing in 2024, RUB million, incl. VAT
4,0921,3951,01172Grid connectionRetrofitting and renovationInvestment projects underthe prospective electricpower industry developmentroadmapOther projects
Investment programme financing sources in 2024, RUB million, incl. VAT and in %
3,989 (61%)2,580 (39%)Funds received under stateregulated tariffsOther sources of financing

Long-term investment programme

Investment Programme of PJSC Rosseti South for 2025–2028

Indicators

UoM

2025

2026

2027

2028

Amount of funding

RUB million

7,496

5,883

4,101

3,787

Capital investment utilisation

RUB million

6,646

5,094

3,138

2,601

Commissioning as fixed assets

RUB million

4,624

5,663

5,070

2,712

Commissioning as a part of fixed assets of transformer capacities, MVA

MVA

98

170

106

66

Commissioning as part of fixed assets of power transmission lines

km

526

472

478

355

Key events 2024

Parameters of investment activities as envisaged in the long-term investment programme

Financing for the period of 2025 to 2028, RUB million, incl. VAT

Astrakhanenergo

Volgogradenergo

Kalmenergo

Rostovenergo

Rosseti South

2025

3,046

1,240

190

3,021

7,496

2026

2,979

560

125

2,220

5,883

2027

921

731

125

2,324

4,101

2028

921

731

125

2,010

3,787

Changes in commissioning of power transmission lines for 2025–2028, km

Astrakhanenergo

Volgogradenergo

Kalmenergo

Rostovenergo

Rosseti South

2025

145

112

52

216

526

2026

181

55

44

192

472

2027

189

90

44

156

478

2028

112

60

44

139

355

Changes in capacity commissioning for 2025–2028, MVA

Astrakhanenergo

Volgogradenergo

Kalmenergo

Rostovenergo

Rosseti South

2025

49

9

1

38

98

2026

10

3

1

156

170

2027

82

3

1

20

106

2028

11

3

1

52

66

The long-term investment programme for 2025–2028 envisages capital investment of RUB 17,479 million (excluding VAT), financing – RUB 21,267 million (including VAT), commissioning of fixed assets – RUB 18,069 million. Between 2025 and 2028, it is planned to re-build and renovate 1,831 km and commission 440 MVA of transformer capacity.